It was a big moment when the first train arrived at Rise. This isn't actually the first train, but it gives a good impression about how things are going to look like eventually. I'm not sure about the track plan, so all the tracks and turnouts will not be fastened until the first operating session has been held. Then it'll be easier to make changes if that's needed. The turnouts will be operated manually until this.
In this area the turntable and engine shed will be. The track to Grimstad is to the right in this picture, and the track for Arendal (hidden staging) is directly above it.
17 December 2008
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment