30 June 2008
Freight depot
20 June 2008
Changes in concept... and a new loco
The real Grimstad Line was closed down in 1961, but already in 1959/60 there were talks with private interest to take over the line from the Norwegian State railways (NSB). Sadly this never happened. But in my world everything is possible, so
I've fast-forwarded my model clock a little bit, and now it's suddenly 1965 in my loft, and the railway is now on private hands as it was in the start from 1907-1912. And it's yet again called Grimstad-Frolandsbanen (GFB). This opens up a lot of possibilities for me with regards to rolling stock, so until I get enough correct pre 1961 NSB equipment, this will be the story.
This opens for use of this lovely steamer from HobbyTrade, which was owned by the Danish State Railways (DSB). Pure coincidence this loco was in real life taken out of service in Denmark in 1965. So the story goes that it was sold to GFB where it found good use.
I will modify the loco so it looks more norwegian with a different lighting arrangement, and with black paint on the smoke stack. It will also get it's own GFB number.
I've fast-forwarded my model clock a little bit, and now it's suddenly 1965 in my loft, and the railway is now on private hands as it was in the start from 1907-1912. And it's yet again called Grimstad-Frolandsbanen (GFB). This opens up a lot of possibilities for me with regards to rolling stock, so until I get enough correct pre 1961 NSB equipment, this will be the story.This opens for use of this lovely steamer from HobbyTrade, which was owned by the Danish State Railways (DSB). Pure coincidence this loco was in real life taken out of service in Denmark in 1965. So the story goes that it was sold to GFB where it found good use.
I will modify the loco so it looks more norwegian with a different lighting arrangement, and with black paint on the smoke stack. It will also get it's own GFB number.
07 June 2008
Trees, trees and more trees
06 June 2008
More scenery III
04 June 2008
More scenery II
20 May 2008
More scenery work
I've shaped the construction foam and added several rock castings from Woodland Scenics and some home made ones. It wont be long now until I actually can start adding color to this area of the layout.
My main goal as of now is to more or less finish the scenery at the end of the peninsula seen here, so it'll look nice and "tidy" when you enter the layout room. The room is in the center of my loft with bedrooms at either end which means I can't close the door to the layout room to hide all the clutter. Therefore it's important to make the layout as nice as possible so it'll play a part as a "furniture" in this room.
18 May 2008
Prototype scenery
14 May 2008
More mountain work
After the foam had dried thoroughly over night, it was very easy (and fun) to start making the basic shape of the hill.
Then I added more foam to the top of the hill.
And for fun, I had to test fit one of the two wonderful small signals for Rykene. They are scratchbuilt for me by modeling friend Jon Einar Vistad.
A foam mountain
17 April 2008
Scenery test
I've laid out some styrofoam sheets to get an idea how things will look when entering the layout room. I have to try to figure out a way to visually seperate the two lines going very close to eachother here to avoid it feeling like the same place. It doesn't look right like the way it is now I think...
Subscribe to:
Posts (Atom)

